Error message

Warning: ini_set(): A session is active. You cannot change the session module's ini settings at this time in drupal_environment_initialize() (line 707 of /home/knipy3a9x0oy/public_html/includes/bootstrap.inc).
Airport_construction_project

Airports

Construction of Airport Project is usually involves execution of the construction in two phases that is into airside and landside areas.

The construction of Airside areas includes all areas that are accessible to aircraft, taxiways,including runways and ramps whereas the Landside areas include contruction of  public transportation train stations and access roads.

Usually – all the above major components are carved into Packages which are then given out to the specialized agencies conforming to the norms as set in the contract document.

tBits CollabWrite – over the life cycle of the Engineering, Procurement & Construction projects in Industrial Infrastructure development – assists by performing the following functions:

tBits Modules used across the project phases

  1. Correspondence Management
  2. Minutes of Meeting Management
  3. Issue & Task Management
tBits usage in Engineering Phase:
  • Document Control– Management of Basic Engineering documents
  • Tender Documents - including Technical & Commercial Evaluation of Bids
  • Detailed Engineering Documents – Till Good for Construction / Release for construction and till As-Built.
  • Uncontrolled DocumentsSite photographs, Monthly Reports, Adhoc documents etc
  • Modules for documents for C&I.
tBits usage in Procurement Phase
  • Quality Process Automation & collaboration between the Vendors, Third Party Inspection Agencies & Owners including:
  • Inspection Calls Management between Vendor, Contractor, Third Party inspection Agencies and Owner till the release of Material Dispatch Clearance Certificates Generation.
  • Logistics Management
  • Site inspections
  • Material Tracking until reconciliation of material to be handed over to Owner at the end of the project as per contract.
tBits usage in Construction Phase:

Collaboration between Site Office, Project Execution Office & Project Engineering Offices.


Post Project Execution Usage